Changelog Since V1.2:
*  Completely new custom 
Quick Drive system implemented, featuring over 60 custom blueprints. 
(THESE ARE NOT CURRENTLY INTENDED TO BE DRIVEABLE, PLEASE USE EXISTING 
CONSISTS)
*  Added various new models,
 some at various stages of completion. These include several new 
structures at Ferryhill, new platforms for Northallerton which are incomplete as the area is still being worked on. Other assets include new trackside fencing and general clutter.
*  The ECML section is 
currently undergoing a complete overhaul, to remove the original ECML 
1979 foliage, and make the trackside more detailed. This is currently 
complete between Heaton Depot and Durham.
PLEASE READ ALL INCLUDED QUICK DRIVE DOCUMENTATION WITH THIS DOWNLOAD 
The update can be downloaded by following this link. 
 


 
No comments:
Post a Comment